\uD83D\uDCCB Overview
Table below shows the themes (for six months) and associated epics (work streams) with what we were able to achieve:
Themes (6 months) | Epics | What we were able/ unable to do? |
Onboard user(s) outside DAAS or similar partners | | Did good amount of presentations and interactions with prospective customers Set up example (basic) data discovery and FS steward FAO deployment/ Eden farm Packaged connector mockup not existing Few example pre-configured connectors No testbed as planned in the first six months
|
Develop single player mode features of FS | | Achieved everything except Participant version 1 but took longer than expected effort in: FarmOS + UC Davis connector Didn’t make many templatised connectors as originally planned
Participant didn’t get released - delay by two months
|
\uD83D\uDCAD Retrospective - collaborative
- Razak K M I had given a top level engineering retro in the other project retro but it will be good if we can have this exercise with everyone involved (including new team members)
Start doing | Stop doing | Keep doing |
---|
| | |
| | |
| | |